

We – EPG Team the bigge EPT Chain and agricultural gearbox manufacturing facility in China with 5 different branches. For a lot more specifics: Cell/whatsapp/telegram/Kakao us at: 0086~13083988828 13858117778 0571 88828
Requirements
soften equipment pump for reactor
1, Fit for large potential output
two, Suit for higher pressure, large viscosity process
Merchandise Description
Huge circulation soften equipment pump for polymer reactor
GM-HK series melt gear pump is particularly suitable for the high output.,high temperature and high viscosity polymer melt conveying reaction , such as resin, chemical fiber industry, generally installed on the lower part of the reaction kettle, a feeding pump.This series of melt gear pump has good self-priming performance, can be used in the vacuum reaction condition, the polymer material conveying and pressurization.
It also can be used to transport hot melt adhesive, asphalt, paint, adhesives, pharmaceutical, food, oil, fuel, oil, dye, paint, lubricants, polyols excluding particulate impurities such as high viscosity materials.
Main application fields
For Processing:
PET PBT
PA6 PA66 PA12
LDPE LLDPE HDPE HMWPE
PP EVA PB
PS HIPS ABS SAN
PC PEHK
PMMA POM TPU
Other Polymers
The structure of the GM-HK series melt gear pump
Rotor type: Spur gear or helical cylindrical gear
Heating type: heating medium jacketed
The raw material of the main parts of the melt gear pump
one)pump case :alloy steel/stainless steel
2)Gear:nitriding steel/tool steel/stainless steel + coating/special alloy
three)Bearing:tool steel/copper alloy/ stainless steel+coating/ special alloy
Installation way:
GM-HK series melt gear pump generaaly is installed under the reaction kettle, it is used as the material discharge pump, usually arranged horizontally.
Drive mode:motor + reducer + universal coupling
Specialized data
Quality inspection
We take only first-class steel and check every production procedure to ensure every dimension is produced precisely. A final complete inspection will be executed before delivery.
Commissioning
We provide the operation manual for customers to gudie to install the screen changer, and at the requirement of user, salers should send technician to install and commissioning the die at site of Buyers, expenses of the trip should be borne by Buyers.
Right after-sales service
12 months with proper operation by user, all the spare parts shall be replaced free of charge under guarantee period, fee for transportation and packing will be borne by use
The use of unique products manufacturer’s (OEM) element numbers or trademarks , e.g. CASE® and John Deere® are for reference needs only and for indicating solution use and compatibility. Our business and the detailed replacement elements contained herein are not sponsored, accepted, or manufactured by the OEM.


